Roof trusses are on.
The frame is up and the roof trusses on. Take notice of the wide eaves - great protection against summer heat and driving rain.
And now for the untreated timber.
Untreated timber is the healthy option for a home so we have had a hefty load delivered. Termites!- you may claim fearfully, don't...
Arrival of the natural woodfibre insulation!
The Steico woodfibre insulation has arrived safely from Europe. We are excited and now ready to start the build. All going to plan we...
The slab is poured!
We have poured the raft slab and allowing it to cure properly. In the meantime we have ordered the natural woodfibre insulation from...
The groundworks have begun.
We have begun excavating the site - the soil is clay and luckily no rock.